Mill Hill East Primary School

London schools benefit from Priority School Building Programme

Overview

A number of schools in Barnet, Greenwich, Lambeth, Newham and Waltham Forest are the first in London to benefit from the UK Government’s £2.4 billion Priority School Building Programme. The scheme’s main objective is to provide best-in-class educational facilities that meet the demands of a growing local population, whilst maintaining the high standards of schooling, for which the borough is already known, and further developing the borough’s reputation as a desirable area in which to live and work.

 

The purpose of this circa £12.3 million project was to build a new school with capacity for 630 primary schoolchildren and 39 nursery places.

 

Commissioned by Kier Construction on behalf of Barnet Council our brief was to supply and install surface water management and sustainable drainage systems.

 

Construction began in March 2013 with the school opening in 2014.

How it works

SDS worked with Kier Construction to design a cost effective alternative system to the concrete tank which had been specified originally and which would be easier and cheaper to construct and install.

 

The system handles not only the surface water runoff from the school and its new all-weather football pitch but also from new housing developments including a 138 home plot of land on the former Inglis Barracks.

results

The project was managed under the terms of the SABS legislation effective from April 2014, whereby responsibility for the adoption and maintenance of SuDS are allocated to Unitary and County Councils Planning Teams.

 

The sports pitch has been built to ‘Sport England’ (formerly the ‘English Sports Council’) specification that demands strict adherence to very specific, tight tolerances. Working with national governing bodies for sport, such as the ECB, RFU and FA, Sport England has produced detailed guidance on how sports clubs can minimise the risk of flooding through good design and site preparation.

 

The system has been successfully integrated with a swale with a capacity of at least 500m3 and with an area available underneath the all-weather pitch with a capacity of at least 3,000m3.

mill hill east school

The Priority School Building Programme (PSBP) is a programme to address the needs of the schools most in need of urgent repair. Through the programme, 260 schools will be rebuilt or have their condition needs met by Education Funding Agency (EFA).

What our Customers say

The ability to meet new best practice guidelines on the quality of surface water runoff was a primary objective of this project. We worked closely with SDS to understand how their stormwater treatment products can deliver suitable water quality improvements; this allowed us to illustrate that the ‘pollution hazard’ associated with the site was adequately mitigated by the specified treatment devices.

Wayne Llewellyn, Principal Engineering Co-ordinator, RPS Planning & Development.