WHAT WE DID
The project site was broken down into two plots, the first of which involved the installation of 500m³ of GEOlight® storage tanks, together with two SDS Aqua-Swirl™ AS-4 Hydrodynamic Vortex Separators, with the ability to cleanse the water at a rate of 91 litres per second.
A second set of tanks, with a combined storage capacity of 1,000m³, was installed a few days later and included a catch-pit manhole with a sump and connected to a Flow Control Device. This second plot also included both an SDS Aqua-Swirl™ AS-2 and SDS Aqua-Swirl™ AS-3 Separator, with water cleansing capacities of 31 and 51 litres per second respectively.
The SDS Aqua-Swirl™ separators are designed to remove more than 80% of the total pollutants in the surface water runoff volume.
The SDS GEOlight® geocellular attenuation tanks on this site have the combined capacity to store up to 1,500m³ of water that has already been treated.